Palfinger Loader Cranes
Notice: Undefined variable: out in /mnt/wordpress_data/fo.kj/wp-content/themes/twentyseventeen-child/template_palfinger.php on line 281
PK 24001-K High Performance
Its hook height at close range is an important characteristic for efficient load handling
- High value retention thanks to coating technology
- Additional applications due to Single Link Plus
- Maximum utilisation of the working range due to HPSC
- Higher payloads due to intelligent lightweight design
- Shorter load cycle times due to High Speed Extension
Max. lifting moment | 23.2 |
Max. lifting capacity | 6100 |
Max. hydraulic outreach | 12.5 |
Max. manual outreach | 16.9 |
Slewing angle | 400° |
Slewing torque | 2.8 |
Stabilizer spread (std) | 5.0 m |
Fitting space required (std) | 0.91 |
Width folded | 2.55 |
Max. operating pressure | 320 |
Pump capacity | 50 - 75 l/min |
Dead weight (std.) | 2451 |
Cranes shown in the leaflet are partially optional equipped and do not always correspond to the standard version.
Country-specific regulations must be observed. Dimensions may vary. Subject to technical changes, errors and translation mistakes.
Country-specific regulations must be observed. Dimensions may vary. Subject to technical changes, errors and translation mistakes.
Lifting moment | Outreach | Slewing angle | Slewing torque (mt) | Pressure | Pump capacity (l/min) | Crane Weight | Crane Height | Crane Width | Installation Width | Max stroke lenght | Max lifting capacity | Load vertical | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A | 23.6 mt | 8.1 m | 400 | 2.8 | 32.0 Mpa | 50-75 | 2451 kg | 2300 mm | 2550 mm | 905 mm | 7946.22 mm | 6100 kg | 2950 kg |
B | 23.2 mt | 10.3 m | 400 | 2.8 | 32.0 Mpa | 50-75 | 2619 kg | 2300 mm | 2550 mm | 905 mm | 10166.22 mm | 6000 kg | 2150 kg |
C | 22.8 mt | 12.5 m | 400 | 2.8 | 32.0 Mpa | 50-75 | 2743 kg | 2300 mm | 2550 mm | 975 mm | 12396.22 mm | 5800 kg | 1660 kg |
The outreaches stated are with a boom angle of 20° and are therefore not the maximum. When using mechanical boom extensions, the loads shown on the charts need to be reduced by the weight of these extensions.